SIEMENS, INELFE

New converting station Santa Llogaia

This work is part of INELFE project, which consists of a new underground electricity interconnection line and crossing the Pyrenees through the massif of Albera between Spain and France of 64.5 km. in length, linking the two converter stations Baixàs and Santa Llogaia. The work consists of five buildings, foundations for Seven main transformers and auxiliary service transformers, rolling vials, various switchgear foundations, drainage system and electrical raceway ten concrete block houses, oil collection tank, metallic structure for chiller system and security perimeter fence.

Project Details

Santa Llogaia d’Alguema, Spain

July 2.011 – March 2.013

Urbanized area performance: 27,800 m²

Excavation volume: 35,000 M3

Selected material fill volume: 25,000 m³

Volume of concrete in various foundations, manholes, etc: 12,000 m³

Pavement surface: 8,000 m²

Surface covered with sandwich panel: 8,000 m²