ENDESA GENERACIÓN
Cycle Combined Power Plant
Cycle Combined Power Plant
Combined Cycle Plant Besos 5 (800 MW). Consisting of 2 gas turbines, 1 steam turbine, Turbine Building, 2 recovery boilers, auxiliary boilers, transformers and auxiliary buildings of gas compression, water treatment, water pipe circulation. The scope covered the buried systems (oil, clean water, drainage, salt, …), civil buildings, and the urbanization of the plot.
Project Details |
---|
Sant Adrià de Besòs, Spain |
Starting Date June 2.008 – Finishing Date: May 2.010 |
Surface of action: 30.000 m² |
Volume of concrete: 25.000 m³ |
Corrugated Steel: 3.450 Tn |