ENDESA GENERACIÓN

Cycle Combined Power Plant

Combined Cycle Plant Besos 5 (800 MW). Consisting of 2 gas turbines, 1 steam turbine, Turbine Building, 2 recovery boilers, auxiliary boilers, transformers and auxiliary buildings of gas compression, water treatment, water pipe circulation. The scope covered the buried systems (oil, clean water, drainage, salt, …), civil buildings, and the urbanization of the plot.

Project Details
Sant Adrià de Besòs, Spain
Starting Date June 2.008 – Finishing Date: May 2.010

Surface of action: 30.000 m²

Volume of concrete: 25.000 m³

Corrugated Steel: 3.450 Tn