ALSTOM POWER
Cycle Combined Power Plant
Cycle Combined Power Plant
Head Plant of Cycle Combined of Malaga (400 MW). Composed by a Building of Turbines, Boiler of Recovery, Refrigeration Tower, Transformers and auxiliary buildings of gas compression, treatment of waters, stores and office blocks. The scope was covering the systems buried (Oily, clean waters, service,…), civil work of the buildings, metallic structure and closings, as well as external Works.
Project Details |
---|
Málaga, Spain |
Starting Date January 2.008 – Finishing Date: March 2.009 |
Surface of action: 55.000 m² |
Volume of concrete: 15.000 |
Corrugated Steel: 1.600 Tn |
Metallic structure: 1.700 Tn |
Closings “Sandwich In situ”:12.000m2 |