TARRAGONA POWER, BASF

Combined Cycle Plant

Combined Cycle plant for Cogeneration 400MW. This Plant consist of a Gas Turbine with 250 MW and a Steam Turbine with 159 MW. Both turbines are included in the Turbines Building.

The remaining important units of the Plant are: Boilers for heat recovery, Air-condensers Unit, Water cooler, Transformers group, Three floor Control Building

Project Details
Tarragona, Spain
December 2.001 – June 2.003
Ground Area 16.800 m2
Road works area 16.800 m2
Offices Area 1.692 m2
Waterproof roof area 3.200 m2