TARRAGONA POWER, BASF
Combined Cycle Plant
Combined Cycle plant for Cogeneration 400MW. This Plant consist of a Gas Turbine with 250 MW and a Steam Turbine with 159 MW. Both turbines are included in the Turbines Building.
The remaining important units of the Plant are: Boilers for heat recovery, Air-condensers Unit, Water cooler, Transformers group, Three floor Control Building
Project Details |
---|
Tarragona, Spain |
December 2.001 – June 2.003 |
Ground Area 16.800 m2 |
Road works area 16.800 m2 |
Offices Area 1.692 m2 |
Waterproof roof area 3.200 m2 |