PORTAVENTURA
PORTAVENTURA
Colorado Creel Hotel (Far West Hotel)
Project Details |
---|
Vila-seca, Spain |
January of 2018 – May of 2019 |
Target area: 4.5 ha |
Erected surface: 4,500 m2 |
Stamped concrete pavement: 4,700 m2 |
Floated concrete pavement: 15,500 m2 |
Volume of concrete: 4,700 m3 |
Perforated brick: 5,000 m2 |