MESSER

Air Separation Unit (ASU)

Previous demolitions of tower, deposits, and Civil Works elements.

New pond, electrical building, metallic structure warehouse, electrical substation, and bottling campaign.

Prefabricated building, cold box, equipment, pipe racks foundation.

Urbanization of streets and outdoor areas.

Project Details
Vilaseca, Spain
Starting November 2020 – Ending February 2022

Demolitions 684’39 m3

Excavations 7,176’83 m3

Formwork 874’25 m2

Concrete foundations 2,472’89 m3

Pavements 4,621’20 m2

Sealing joints 1,662.47 ml