IKEA II IBERICA
IKEA II IBERICA
Second storage & distribution center
Second storage & distribution center
Project Details |
---|
Valls, Spain |
Start date: 02/11/2.006 – Completion date silo: 03/11/2.007 |
Approximately 400.000 m3 of earth moving |
Surface Foundation composed of reinforced concrete shoes |
Prefabricated Reinforced concrete structure in the warehouse and metal structure in the office building |
Enclosures made with double metal panel filled with insulation material in the warehouse and with sandwich type metal panel in the office building |
Concrete support reinforced with steel fibers |
Deck type plain roof |