IKEA II IBERICA
IKEA II IBERICA
Second storage & distribution center
Second storage & distribution center
| Project Details |
|---|
| Valls, Spain |
| Start date: 02/11/2.006 – Completion date silo: 03/11/2.007 |
|
Approximately 400.000 m3 of earth moving |
|
Surface Foundation composed of reinforced concrete shoes |
|
Prefabricated Reinforced concrete structure in the warehouse and metal structure in the office building |
|
Enclosures made with double metal panel filled with insulation material in the warehouse and with sandwich type metal panel in the office building |
|
Concrete support reinforced with steel fibers |
| Deck type plain roof |

