REPSOL ESPIGÓN

Espigón for Terminal T3 protection for the RLP 35 Project

Construction of a breakwater to protect the pipelines of the T3 terminal in the surf zone, with a length of 160 m, divided into 4 sections (3 trunk sections and 1 nose section).

Project details
Ventanilla, Callao (Perú)
04/2021 – 08/2021

Selected fill: 4,100 Tn.

Core (1 to 100 kg): 25,000 Tn.

Filter breakwater (75 to 500 kg): 9,900 Tn.

Shell breakwater (0.9 to 6.0 tn): 17,500 Tn.

Precast concrete molds: 110 m3.