REPSOL ESPIGÓN
REPSOL ESPIGÓN
Espigón for Terminal T3 protection for the RLP 35 Project
Espigón for Terminal T3 protection for the RLP 35 Project
Project details |
---|
Ventanilla, Callao (Perú) |
04/2021 – 08/2021 |
Selected fill: 4,100 Tn. |
Core (1 to 100 kg): 25,000 Tn. |
Filter breakwater (75 to 500 kg): 9,900 Tn. |
Shell breakwater (0.9 to 6.0 tn): 17,500 Tn. |
Precast concrete molds: 110 m3. |