GOMÀ-CAMPS & WEPA

Paper factory and offices

The project includes two areas with different characteristics:

A converting building.

A building for the offices.

Project Details
Ejea de los Caballeros, Spain
October 2.004 – April 2.005
Converting building surface: 15.000 m²
Offices building: 1.500 m²
External areas: 3.000 m²