FORD, ALMUSAFES

Car Factory

In the period of construction of the factory 1973 -1976, Carbonell Figueras, S.A. got an agreement to execute the civil work of the assembly line. From that date and by annual contracts we have continuously performed these works, which vary a lot according to the characteristics of the equipment that has to be installed. In some cases reaching a great complexity, as in the installation of the new 4 shafts press, which needed the application of a special technology to demolish 1,200 m3 of concrete with an elevated number of framework. Within the 6 days of installation, the work was continuously done.

Project Details

Almusafes, Spain

September 1.997 to May 1.999
Site surface 12,000 m2
Built surface 11,700 m2
Laboratories surface 3,500 m2
Offices surface 4,700 m2
Public area surface 900 m2
Surface of parking space and other services 2,600 m2