CORPORACIÓN ACEROS AREQUIPA
CORPORACIÓN ACEROS AREQUIPA
New Distribution Center and Steel Center
New Distribution Center and Steel Center
Project details |
---|
Lurín, Lima (Perú) |
04/2022 – 06/2023 |
18,700 m3 excavation. |
47,900 m3 filled. |
14,370 m3 concrete. |
24,470 m2 formwork. |
1,246 Tn of reinforcing steel. |
81.3 Tn embedded steel. |