End of work
The works of substitution of the buried piping of the fire-fighting network of the northeast zone of the BASF Española plant, located in the municipality of La Canonja, province of Tarragona, have been completed.
The substitution has required the previous dismantling of the existing carbon steel pipes and the installation of other analogous HDPE pipes, always with sections previously negotiated with the BASF Fire Department and providing an alternative service. The photo shows the Carbonell Figueras team that participated in the project and the work supervision by RDT.

