CORPORACIÓN ACEROS AREQUIPA
CORPORACIÓN ACEROS AREQUIPA
New Distribution Center and Steel Center
New Distribution Center and Steel Center
| Project details |
|---|
|
Lurín, Lima (Perú) |
| 04/2022 – 06/2023 |
|
18,700 m3 excavation. |
|
47,900 m3 filled. |
|
14,370 m3 concrete. |
|
24,470 m2 formwork. |
|
1,246 Tn of reinforcing steel. |
| 81.3 Tn embedded steel. |

